Hi, when we run the master planning, AX 2012 creates production order for sub-Bom which is defined as a phantom. I have freeze time fenze not selected. http://support.microsoft.com/kb/918052. the coverage group doesn't specify freeze time fenze either.
How can we prevent this? thanks a lot