1) Item card say tooth brush with unit of measure is pieces as I keep my inventory in pieces. I also sell in pcs and if required I purchase in pieces only.
2) The runtime for one production cycle is 1 hr.
3) In one production cycle I produce 20 pieces.
4) I create production order for 40 pieces as there is a sales order for 40 pieces.
5) As per the system time required to produce 40 pieces is 40 hrs. This is because system multiple Qty required by run time.
6) But in above scenario to produce 40 pieces I only require 2 hrs. How to achieve this if it is possible in the base product.
7) If I change the UOM in production order to achieve 2 hrs than output is also in that unit and my inventory will be increased by 2 with UOM as box which is wrong.

Any suggestion how to handle it .