Hi everybody!!
Exists in AX 2012 the option of having the production plan for the (lets say) next 15 days valorized? To know what the total cost would be in that period?
Hi everybody!!
Exists in AX 2012 the option of having the production plan for the (lets say) next 15 days valorized? To know what the total cost would be in that period?